Erwin High School – Asheville, NC
589.05 kWdc/462.5 kWac – Total System Capacity
Kitchen – 381.15 kWdc/312.5 kWac
Main – 207.9 kWdc/150 kWac
Total System Output – 848,955 kWh
Kitchen – 554,569 kWh
Main – 294,386 kWh
Contractor – MB Haynes
Kitchen – 381.15 kWdc/312.5 kWac
Main – 207.9 kWdc/150 kWac
Total System Output – 848,955 kWh
Kitchen – 554,569 kWh
Main – 294,386 kWh
Contractor – MB Haynes
69.2 Homes Energy Usage for 1 Year (accounts combined)
79%(kitchen)/69%(main) of electricity offset by solar
In Development