AAR Airframe MRO – Greensboro Facility

AAR Airframe MRO – Greensboro Facility

Combined Energy Offset:

icon-industry  51% of electricity is offset by solar

Combined Annual Solar Production is equivalent to:

icon-co2  2,000 Metric Tons

icon-home  269 Homes Annual Energy Usage

Combined System Size

icon-lightning  4.6MWdc / 2.8MWac net-metered

Total Annual Production

icon-lightbulb  5,983,000kWh

 

*CO2 offsets & equivalencies calculated by AAR.

Project overview

Pisgah Energy designed, developed, and installed 4.6 MWdc of rooftop solar across six buildings at AAR’s Airframe MRO – Greensboro facility at Piedmont Triad International Airport. The systems are net-metered and produce about 5,983,000 kWh a year, offsetting roughly 51% of the facility’s electricity use. Collectively, they are Guilford County’s largest rooftop solar installation and Pisgah Energy’s largest completed project to date.

Working at an active airport

Solar on airport property takes extra analysis. Before construction, our team completed a solar feasibility study and a glare hazard analysis in coordination with the FAA and the airport. We then built the systems on the facility’s five hangars and composites building while AAR’s operations continued, finishing on schedule and under budget.

Why it matters

Beyond lower electricity costs, the project supports AAR’s goal of reducing its carbon footprint, with annual production equivalent to about 2,000 metric tons of CO2. 

 

Media Coverage:

Client:
AAR
Services:
Design-Build
Date: